+44 (0)1928 500005
 
 
The UK's Number 1 Industrial Lift Manufacturer
 
 
Post Image

Less abled funicular lift installed at Farmoor Resevoir

Post Image
 

Elephante engineers have completed the install of a 250kg less abled funicular lift at Farmoor Reservoir, which will carry an individual in their wheel chair and an attendant from the ground floor landing stage to the pontoon landing stage.

The lift is designed to accommodate the reservoir fluctuation and the angle of travel will vary depending on the water level.

Elephante are very pleased with advanced level of engineering used to successfully complete this project.

The lift was officially opened on Tuesday 17th April 2012 and disabled sailor Geoff Holt was the guest of honour. Please see the attached link, the picture is showing Geoff emerging from the Elephante lift and the video is of the lift in working process.

http://www.bbc.co.uk/news/uk-england-oxfordshire-17740518

http://www.bbc.co.uk/news/uk-england-oxfordshire-17750313

Further pictures of the installation and lift will be in our gallery soon.